Pilgrim Watch 2012 Update

󰀃Mary Lampert, Pilgrim Watch

󰀓Pilgrim Risks: Accidents and Daily Operations (September 29, 2012)

TABLE OF CONTENTS

Pilgrim: How Boiling Water Reactors Work 1

Accidents
Spent Fuel Storage -Pool Fires 2
Containment Failure: Vent & Hydrogen Explosions 5
Pilgrim- Electric Reliability 10
Security 11
Emergency Planning 12
Post Accident Cleanup 16

Risks From Daily Operations
Radiation Health Impacts 17
Monitoring 22
Marine Impacts 29

NRC Oversight- Public Participation- Alternatives
NRC Oversight 30
Public Participation 31
Do We Need Pilgrim’s Electric Power? 32

JRWA & Pilgrim Watch: Third Appeal to NRC

󰀓May 14, 2012: Group Appeal to NRC, Docket 50-293LR

󰀍Jones River Watershed Association, Inc. (JRWA) and  󰀍Pilgrim Watch (PW) today filed a third legal challenge in front of the Nuclear Regulatory Commission (NRC) to Entergy’s once-cooling water withdrawals and pollution of Cape Cod Bay.

Entergy is violating state and federal water pollution control laws; lacks two state approvals that are prerequisites to relicensing; and the PNPS environmental impact statement is invalid. The application for relicensing Pilgrim Nuclear Power Station (PNPS) should, and must, be denied because Entergy cannot satisfy NRC regulations.

JRWA has already filed multiple contentions with the NRC for review of impacts to Cape Cod Bay’s natural resources; and is working with Pilgrim Coalition to encourage state agencies to act. Our senators and representatives are doing what they can to ensure the safety of the people and environment of southeastern MA; but citizen support is still crucial.

This is your opportunity to speak! Please show support for more conscientious oversight and safety fixes of the Pilgrim Power Station. For more information and to get involved, visit:

󰀽Plymouth, Massachusetts    󰀁PO Box 2015, Mashpee MA 02649    󰁂Contact us

󰀬    󰀪    󰀻

󰁓