OPINIONS
Fukushima – weighing risks, offering options
Sara Altherr, Kingston resident Letter to the Editor, Kingston Reporter →
March 11 will be the second anniversary of the devastation of the nuclear power facility in Fukushima, Japan. I hope all Kingstonians will take a minute to contemplate how that disaster – half a world away – holds important lessons for us.
The nuclear reactor at Pilgrim Nuclear Power Station in Plymouth is the same design as those in Fukushima. This reactor sits only 10 miles from most of our homes in Kingston. Although a great tsunami initiated the disaster, the actual cause of the explosions and enormous release of radioactivity at Fukushima was the lack of electricity – electricity needed to operate pumps which cool the reactor itself and the nuclear waste reservoir.
Plymouth’s Pilgrim Nuclear Power Station – owned and operated by Entergy Corporation of Louisiana – is 40 years old and was recently relicensed by the Nuclear Regulatory Commission (NRC) for another 20 years. The facility was originally planned to operate for 40 years, but, despite concern from local residents and town officials, the NRC decided to go ahead and re-license it without requiring Entergy to abide by new safety guidelines developed since Fukushima.
Kingston Town Meeting approved an article last April that asked the NRC to require Entergy to suspend approval of Entergy’s new license until full implementation of safety improvements based on the Fukushima experience had occurred. Ten other towns in the region also approved similar town meeting articles or ballot questions. Despite those requests and others from state, federal and local officials, the NRC granted Pilgrim’s license renewal.
Since that time, many of us who are concerned about the risks of continued operations at the Plymouth facility have been meeting and continuing activities to try to protect our area from a fate similar to Fukushima’s. I work with the umbrella group Pilgrim Coalition. Various member organization have been working to get the NRC to do its job of “protecting people and the environment.” We have worked with federal, state, and town officials, relevant state and federal agencies and others to lessen the chances that such a disaster happen here.
Another close call at Pilgrim
For the second time in two weeks, Entergy’s Pilgrim nuclear reactor experienced an “event” requiring notification to the NRC. The scram discharge volume valve (valve CV-302-22B) failed on March 1, 2013 and February 18, 2013. http://www.nrc.gov/reading-rm/doc-collections/event-status/event
According to the Union of Concerned Scientists, “The scram discharge volume is a large metal tank that collects the water vented from the control rod’s hydraulic pistons during a scram. It is sized to contain all the water vented during a scram. CV-302-22B is one of the valves on the drain line from the scram discharge volume. When a scram signal occurs, this valve automatically closes (or is designed to do so, whether it does so is another matter).”
The NRC requires Entergy to make sure this valve is operating as designed because it is a mechanical system that is critical to Pilgrim’s safe operation. The valve is part of the reactor shutdown system, and must be able to operate during a “scram”. A scram means for some reason Entergy has to stop the nuclear reaction (the fission that splits the atoms) from happening.
During the February, 2013 blizzard (Nemo) Pilgrim had to shut down twice – that is, Entergy had to stop splitting the atoms. What if the valve had failed then-instead of a mere 9 days later, on Feb. 18?
Pilgrim exceeds industry averages for automatic shutdowns and unplanned power outages. http://www.capecodonline.com/apps/pbcs.dll/article?AID=/20130227/NEWS/302270347
The U.S. NRC says that the valves (called “scram discharge volume piping”) have only a one in a million chances of interfering with reactor shut down. But, according to the Union of Concerned Scientists, in June, 1980, that is exactly what happened at the Brown’s Ferry nuclear plant in Alabama: that one in a million chance happened and almost caused a nuclear disaster. http://allthingsnuclear.org/fission-stories-107-mystery-plug
If Entergy’s valve had failed to operate during one of Pilgrim’s many shutdowns during the last year, there could have been a serious nuclear emergency.
Pilgrim is old and worn out. It presents an unacceptable risk to our region-and this is just one more example of that.
ACTION you can do to help! Re: nuclear safety
Dear Friends,
Here is a simple thing you can do to help prevent harm from outdated nuclear power plants.
The NRC Commissioners are in the thick of a debate about whether or not to install filters on US nuclear reactors to prevent radiation leaks in case of a disaster. They are planning to vote soon on this topic. Industry is pressuring them not to require filters because it will cost them money, but we citizens deserve this safety precaution! The risk is too high and, at the very least, we can at learn a lesson from Fukushima. Word is there are two commissioners who are swing votes and we need to convince them to vote for filters! Here are their email addresses. Below is an example letter for you to use to create a letter of your own.
“Just do it!”
— Anna Baker
Commissioner Ostendorff: CMROSTENDORFF@nrc.gov
Commissioner Magwood: CMRMAGWOOD@nrc.gov
Dear Commissioner,
I understand that the NRC Commissioners are scheduled to vote soon on whether to follow your staff’s recommendation to order filters on vents in Mark 1 and Mark II reactors. I am writing to urge you to vote in favor of these vents. As a mother of two young children who lives near the Pilgrim reactor I would like to know that, in a severe accident, radiation will not be released directly from the reactor core into our neighborhoods. Considering the potential consequences, filters should be a no-brainer.
Thank you,
[Name]
[Address]
Another legal avenue closed for Pilgrim safety advocates, but…
It’s no surprise and it’s not over yet!
On February 26, 2013, the Massachusetts Attorney General’s office lost a bid to force the federal Nuclear Regulatory Commission (NRC) to consider new information about the risks to the public safety and the environment from Entergy’s Pilgrim nuclear reactor. View the U.S. First Circuit Court of Appeals decision here
The Attorney General tried to argue that Fukushima nuclear disaster revealed new information about high level nuclear waste spent fuel pool fires and core damage events that should be considered before Pilgrim was allowed to be relicensed for another 20 years. These “events” would release large amounts of radioactive material throughout the region, with unimaginable consequences.
The Court ruled in favor of Entergy and the NRC, and would not let the AG proceed with the challenge. No surprise there! Winning a court case against the NRC and the nuclear industry is extremely difficult. This is because the law that created the NRC, called the Atomic Energy Act, gives the NRC expansive powers to make the rules about who can challenge their decisions. As the Court said, the Atomic Energy Act is “a regulatory scheme which is virtually unique in the degree to which broad responsibility is reposed in the administering agency [the NRC]….” The Act is pro-industry, and the NRC, in making more rules (called regulations) on who can challenge its decisions, has taken that mission to heart: protect the industry, shut out public interest advocates.
In the February 26 decision, the Court said the AG did not meet the standards of the NRC procedural laws for getting a hearing on the safety issues. The Court also said the AG could not challenge the Pilgrim relicensing under the National Environmental Policy Act (NEPA), which requires the NRC to take a “hard look” at environmental impacts.
The Court’s decision by no means says Pilgrim is “safe.” In fact, the Court said the NRC still has to make Entergy fix numerous defects at Pilgrim, even though Pilgrim has been relicensed until 2032. There are three types of defects at Pilgrim the NRC is thinking of making Entergy fix as a result of Fukushima: lack of filtered vents for emergencies, inadequate ways to figure out the water level in the spent fuel pool, and inadequate core cooling containment. As we speak, industry is lobbying the NRC to say no fixes, claiming they are too expensive and unwarranted. Today, the New York Times wrote about this: Post-Fukushima, Arguments for Nuclear Safety Bog Down
The NRC isn’t the only one who gets to say how Pilgrim operates, however. State and local officials have a say, too. Entergy must meet state and local environmental and zoning laws. Admittedly, state and local authority over Pilgrim is limited, but it does exist. Unfortunately, Massachusetts state regulators are taking a hands off approve on Entergy’s water pollution. Other officials are looking the other way while Entergy is building a $165 million nuclear waste storage facility without proper permits. Vermont and New York officials have been much more active in trying to protect the public from Entergy’s nuclear reactors in those states.
Politicians at the state and federal level are discussing new laws to address the nuclear waste and other issues. Today, The Hill reported that Ohio Democratic Sen. Ron Wyden expects a draft nuclear waste bill shortly. Sen. Wyden is quote as saying, “I call the nuclear waste issue one of those issues that feels like the longest running battle since the Trojan War, and I think it’s time to get on with it.” Massachusetts state legislators have also announced legislation to deal with Pilgrim. Let’s hope these legislators can “get on with it.”
Meanwhile, back in Manomet, Entergy is going to being refueling Pilgrim in March or April. This means Entergy is going to bring in more nuclear fuel rods so that it can continue to run — and make even more nuclear waste.
Concerned residents across the region are telling federal, state, and local officials that enough is enough… and its time to act.
Find out more:
www.capedownwinders.org
www.pilgrimwatch.org
www.capecodbaywatch.org
The Entergy Endtimes Enviro Show
Enviro Show: Every other Tuesday, 6:30–7:30 pm
Re-broadcast every Thursday at 2:00 pm
On-Air: WXOJ-LP (103.3 FM) WMCB (107.9 FM)
Streaming Online: valleyfreeradio.org WMCB.net
Deb Katz of Citizens Awareness Network calling in…
Original blog post: envirosho.blogspot.com
Goodbye Entergy-Louisiana
Cape Cod Bay Watch Source →
While Pilgrim was in the middle of a shut down due to a cooling system malfunction, the NRC decided it was time to reissue the 20 year operating license. This is an outrage, and groups vow to continue the fight against the dangerous, polluting reactor in Plymouth.
“Sometimes equipment doesn’t operate as you would hope.”Entergy spokesman Jack Alexander, Entergy Manager of Government Affairs (in State House News Service, Andy Metzger, May 23, 2012)
Well, that about says it, Jack! You’ve admitted Pilgrim isn’t safe and that you can’t ensure that it will operate for another 20 years “the way you would hope”!
Entergy’s accident on May 22 sent superheated water from a backwash operation into Cape Cod Bay. The U.S. EPA and the state DEP are AWOL and refuse to answer our questions about what happened with this outdated cooling water system that’s falling apart.
Meanwhile, Entergy CEO J. Wayne Leonard CEO and lobbyists got their Republican buddies in the House to chastise the NRC for being “unfair” to Entergy. Pilgrim Coalition wrote back, blasting Fred Upton and his cronies on the House Energy and Commerce Committee for doing the bidding of Entergy, a Louisiana carpetbagger making $1-million a day off the backs of Massachusetts ratepayers: May 24, 2012: PC Letter to US House
And then the NRC decides to issue the new license – but the outgoing Chairman of the Commission blasts the decision as unfair to Massachusetts residents who have valid concerns over safety and the environment that have not been addressed. Read the Chairman’s Comments here: May 21, 2012: Jaczko blasts NRC
The NRC’s decision is ILLEGAL and we will pursue the many other avenues available to us to shut Pilgrim down. The fight to shut down Pilgrim has just begun!
Nuclear safety should be a concern
Anna Baker | Letter to the Editor (Marshfield Mariner) Source →
I put forward an article regarding nuclear safety before the forthcoming annual Town Meeting. If you feel strongly about a new high school, seawall improvements, a community center, etc., you should feel similarly compelled to understand an issue that protects you from a nuclear disaster.
To be clear, the article up for town vote is neither anti nor pro-nuclear. It is simply focused on safety improvements at the Pilgrim Nuclear Power Station in Plymouth. The nuclear reactor’s license expires this June and the Entergy Corporation, its owner, applied for a new 20-year license. The reactor was originally designed to operate for 40 years, which has already lapsed!
Pilgrim has many safety shortfalls. The largest threat is that the reactor was originally designed to hold 880 spent fuel assemblies; it now has more than 3,200 in an overcrowded pool. If the reactor loses electricity (used to cool rods), the fuel can combust and cause a meltdown.
The Nuclear Regulatory Commission (NRC), a federal agency, has a “comfortable relationship” with the nuclear power industry and is not requiring needed safety changes before re-licensing the plant. After last year’s nuclear catastrophe in Fukushima, the NRC created a task force that developed recommendations including lessons learned from that catastrophe. This article simply requests that these same safety fixes are made prior to granting Pilgrim a new license. Pilgrim’s construction is the same design as the Fukushima reactors.
Designed to Fail: An Overview
Pilgrim’s 40-year license to operate expires on June 8, 2012; and despite its age, failed design, and unresolved safety and environmental issues, there is concerted pressure to rubber-stamp Entergy’s application to extend its license another 20 years, to 2032.
We believe that the license extension should be postponed until the lessons learned from Fukushima are fixed and all the unresolved safety and environmental issues are fully examined in hearings before the Atomic Safety Licensing Board.
Pilgrim is a carbon copy of the Fukushima reactors and could easily fail for the same fundamental reasons: loss of electrical power, serious design flaws, and human error.
Further, Pilgrim is an “antique.” It was designed and built when the Ed Sullivan Show introduced the Beatles to America. The risks for catastrophe change as reactors age, just as the risk for accident and death due for people as they get older. How many household appliances or cars do you use that are over 40 years old?
An accident can destroy not only “America’s Hometown,” but the entire region, just like in Japan; but unlike the spread of dangerous radiation in a disaster, emergency plans to evacuate or shelter the population stops at 10 miles.
Additionally, the effects from daily operations need to be considered and mitigated, as required. Pilgrim emits radiation into our air and water daily. Allowable releases have not been lowered to match today’s scientific understanding of radiation’s harmful health effects, and offsite monitoring is insufficient to provide a reliable “Neighborhood Watch.”
Last, Pilgrim directly impacts our marine environment. It uses an outdated method to remove excess heat that it generates by drawing in over 500 million gallons of water daily from Cape Cod Bay, along with fish eggs and smaller fish. The water passes “once through” the reactor and back into the bay heated as a thermal plume, scalding our ecosystem. Unlike our fishermen, Pilgrim has an “unlimited fishing permit.” In addition, Pilgrim steam cleans the intake screens to keep mussels from clogging the works, spiking the temperature even higher. The net effect is harm to both our valuable marine economy and to our endangered species by depleting their food supply – this is not necessary. Technology exists to lessen the impact; like everyone else, Pilgrim should be required to employ the “best technology” available to minimize adverse environmental impact.
There is no reason to rush through the relicensing process. The NRC rules allow Pilgrim to operate on its original license until a decision is made on its application; there’s time to do it right.
Mary Lampert Pilgrim Watch →
We don’t need Pilgrim!
Robert R. Holt | Letter to the Editor (Cape Cod Times)
After describing the recommendations of the NRC’s post-Fukushima task force, your editorial of March 21 then assumes that they are already improvements, neglecting the fact that the industry has five years to adopt them! It’s also an elementary error to treat “safe” as an all-or-none term. When NRC declares that all U.S. nuclear reactors are safe, they mean “safe enough for Americans,” even though Germany realizes that one disaster every dozen years (the industry’s present record) isn’t safe enough for them. Why should Entergy assume the right to put at risk many millions of people all over the world, who don’t benefit from nuclear power, so they can enjoy big profits? Because nuclear spews less greenhouse gases than fossil fuel plants? Several experts, notably Amory Lovins (www.reinventingfire.com), demonstrate a better alternative: adopting easily available, cost-effective ways of using energy efficiently creates more good jobs than lost by abandoning fossil fuels, saves enough money to accelerate renewables, and cuts CO2, avoiding catastrophic climate change. We can do more with enough less electricity to close down, not build more, coal plants while phasing out nuclear power as well. Pilgrim can’t be made safe enough to extend its license; let it die now!
Entergy “Cowardly” in Refusing to Attend Upcoming Nuclear Forum
Wedge Bramhall | Letter to the Editor Source →
Plymouth resident Wedge Bramhall urges the NRC and Entergy officials to attend an upcoming forum on Pilgrim nuclear plant, and the nonbinding referendum opposing the plant’s relicensing.
The Pilgrim Nuclear Station hidden from most peoples view has been operating for nearly 40 years. Every ounce of high level nuclear waste that has been produced by this plant still sits in Pilgrims spent fuel pool. This plant now holds well over 1,200 tons of high level waste. The waste is stored in what most industry experts say is the most vulnerable spent fuel pool in the business. The pool is well over three times denser than originally designed back in the sixties.
About six years ago Entergy began a process to relicense the plant for an additional 20 years beyond its designed life. So not only do we have a tired old poorly designed plant we now have a high level nuclear waste dump attached to it.
The elected officials that we look to for safety issues related to the nuclear plant have let us down. Especially after the horror show that has occurred and will continue for many years to come over there in Fukushima. You would think that Entergy executives would be on their knees begging us to continue doing business here on the South Shore. Instead we are still watching our elected officials continue to kiss up to the Entergy suits.

